It seems like we are getting closer but that only seems to emphasize the that which we still have left to do. The Galvalume is nearly complete on the light monitor and should be wrapped up this week. We have attached the base cabinets to the wall but need to exchange some upper cabinets for wider units. Another trip to IKEA, sigh. The plaster in the bathroom is finished and we sealed it this weekend. It is ready for plumbing. Theoretically, by the end of this week we should have the following complete:
- Electrical devices in;
- Plumbing hooked up;
- Heat;
- Sub-tops on cabinets with sink and cooktop set, ready to receive concrete;
- Galvalume completed on the light monitor;
- Tall cabinets in place.
We'll see how we do. My back made it hard to work this weekend so Anne did all the heavy lifting.
The bathroom is rather difficult to photograph.
It felt good to rip the plastic off.