9.21.2007

(en)Closure

Brief update for those still following along. We've been taking process photos but the film has not been developed yet (our digital cameras were MIA). Below are a few more recent images and we hope to supplement them with some more in-between shots a little later on. For now, the house is enclosed. All doors are in and interior framing is essentially done. The roof is insulated and spray-foamed. There's some miscellaneous framing still left on the exterior. We even have kitchen cabinets fresh from IKEA on site, though it will be a couple of weeks before we are ready for them.

The doors are covered with "protective" films inside and out which Andersen boasts will help keep the windows protected and make painting easier. The problem is that the film stops 1/4" from the frame meaning that painting is no easier; unless you want a 1/4" wide paint strip around your windows.



Morning light in the shower.
The ceiling is complete. The cutout running perpendicular to the ceiling joists will be a recessed light trough.

Radiant tubing.

No comments: